Insurance Claims & Adjuster Disputes
Starter course, ridge cap, drip edge, valley metal and ventilation are required on every re-roof and routinely missing from carrier estimates.
Written by Nathaniel Davis, owner of Roof Gutter Now — a licensed exterior restoration contractor in Ohio, Pennsylvania and New York. Updated August 2026

Take each item separately with the manufacturer specification or code section that requires it, and the measured quantity. Requesting five itemised additions with citations gets a different response than requesting a lump-sum increase.
Reuse language deserves particular attention. Ask directly how a component is to be salvaged intact during tear-off. Most reuse lines exist because nobody asked.
No. It is their opening scope. Supplements exist because first estimates are rarely complete.
Ask for the refusal basis in writing against the code or manufacturer requirement you cited. That usually resolves it.
Supplements are typically handled during or after the work, not before. The job does not have to wait.
See Insurance Claims services or find your local crew.
Free inspection, photographs of every finding, and a written scope before any work starts.
Call (330) 918-1018